Mangoky River Basin Farmland Harnessing Project in Madagascar Passed Preliminary Acceptance
May 13, 2022

On March 31, the Ministry of Agriculture of Madagascar organized the supervision company, National Laboratory and other institutions to conduct the on-site acceptance of the farmland harnessing project in the Mangoky River Basin of Madagascar. After the site review, the project met the acceptance conditions and successfully passed the preliminary acceptance.

The Ministry of Agriculture of Madagascar organized acceptance of the level-3 canals in the project

The project, funded by the African Development Bank, is mainly composed of harnessing the 290 hectares of farmland in the Mangoky River Basin. As the third agricultural project carried out by Madagascar Zhengwei in Madagascar, the project has helped the company accumulate new experience in the agricultural farmland harnessing projects.

Level-4 U-shaped pipe duct

全球网络,本地响应
全球网络,本地响应

全球网络,本地响应

欢迎通过以下方式与我们取得联系,我们分布在全球的专业团队将为您提供及时响应。