WIETC Signed the Contract of the IKOPA River Embankment Rehabilitation Project in Madagascar
January 11, 2023

        Recently, WIETC has made another success in the field of river dredging and flood control engineering in Madagascar. It signed the contract for the IKOPA River embankment rehabilitation project. The project is mainly to repair five water-damaged points on both sides of the IKOPA River through the capital Antananarivo, including the filling of the embankment, stone slope protection, stone retaining wall and the construction of the road on the top of the embankment. The project is financed by World Bank loans. The contract period is four months, and the construction is expected to start in early November.

An embankment of the IKOPA River to be repaired

全球网络,本地响应
全球网络,本地响应

全球网络,本地响应

欢迎通过以下方式与我们取得联系,我们分布在全球的专业团队将为您提供及时响应。